Manually execute InMemory Scheduler with arguments
When setting up a schedule, it's possible to add arguments, which could be used for e.g., incremental or full load. However, when running the schedule manually, these are not used, as a job can have multiple schedules with different arguments.
It would be nice to be able to execute a schedule manually while also being able to put in arguments.
1
Comments
Please sign in to leave a comment.