Setting a Batch Job
Hello
i have a question in regards to the batch option in scheduled jobs. When I create a scheduled job with batch processing I get one document per selected dimension (for example one document per cost centre). I want to make this process more lean as I want to combine a fixed cost centre with a changing cost centre.(for example 100 and 101 or 100 and 102) But when I set this in the batch setting I get two documents, one for each cost centre. I tried to create a report where cost centre 100 is fixed by a criteria and then made a scheduled job with a batch selection for cost centre 101 and as a result I get a report with values for cost centre 101. Is there an option to get a combined value by using a job with batch processing or is my only option to create different reports with fixed criteria?

Comments
5 comments