Scheduled job can start other (multiple) scheduled jobs
Suggests a jobtype that will execute other jobs (multiple jobs).
By changing the schedule from e.g., 07:00am to 06:30am for a job of this new type, you will effectively have a single point of entry for changing the schedule of all attached jobs.
0
Comments
Please sign in to leave a comment.